Get the latest Fresh Dirt on Carolina Environmental Contracting!

Third Fork Creek Restoration Project

Carolina Environmental Contracting is excited to begin a new restoration project for the City of Durham, NC on Third Fork Creek. 

Piedmont Triad International Airport Storm Water Drainage Repair

It is exciting for Carolina Environmental Contracting’s storm drainage team to tackle storm drain issues at the Piedmont Triad International Airport in Greensboro, NC.  While we all certainly think of airports as a way to bypass many the issues of roads and infrastructure, there are a lot of drainage issues created with the vast pavement systems that airports encompass.  

Cedar Trail Greenway Construction Project

Carolina Environmental Contracting recently completed the construction of a 4000 ft greenway trail connection from Cedar Trail to the existing Muddy Creek Greenway, in Winston-Salem, NC. The project involved the construction of a 10 ft. wide asphalt greenway with grassed shoulders, clearing, grading, installation of storm drainage piping, and paving of the trail.  To improve access for users, Carolina Environmental Contracting used a crane to install a 100’ steel pedestrian bridge and built a 30’ concrete boardwalk across a small tributary.  A time-lapse video provides a tour of the project.

Little Snow Creek Stream Restoration

A strong partnership collaborated to successfully restore Little Snow Creek in Stokes County, NC.  The cattle will no longer have access to the stream, the channel is stable, and both the stream habitat and water quality are significantly improved.

Get Started On Your Project Today!

Give us a call:

(336) 320-3849

Send us an email: