Viewing posts from April, 2017

CEC Repairs Owen Drive after Hurricane Matthew

The 2016 Category 5 storm, Hurricane Matthew, hit North Carolina hard as it traveled north along the east coast. The storm was the 10th most destructive storm in the history of the United States. Shoulders and slopes along highways were washed out throughout the south as record rains battered the area. Loss of slopes and shoulders compromised the guardrails that protect motorists from those slopes.

Bryan Park Rd Culvert Replacement

Bryan Park Road in Greensboro is one of the area’s busiest and most prestigious thoroughfares. Any disruption of traffic is significant. Faced with a forced road closure to repair underground pipes, officials in the Spring of 2017 called Carolina Environmental Contracting to prepare the site for replacement of a large corrugated metal pipe within a double barrel culvert under the roadway.

Third Fork Creek Restoration Project

Carolina Environmental Contracting is excited to begin a new restoration project for the City of Durham, NC on Third Fork Creek. 

Get Started On Your Project Today!

Give us a call:

(336) 320-3849

Send us an email: