Bryan Park Rd Culvert Replacement

Bryan Park Road in Greensboro is one of the area’s busiest and most prestigious thoroughfares. Any disruption of traffic is significant. Faced with a forced road closure to repair underground pipes, officials in the Spring of 2017 called Carolina Environmental Contracting to prepare the site for replacement of a large corrugated metal pipe within a double barrel culvert under the roadway.

The road’s location and traffic count created an extremely tight construction. To prepare the site for road closure and pipe installation, Carolina Environmental Contracting performed extensive clearing and grubbing operations.  Trees and vegetation were removed. The debris was hauled to an offsite location for disposal and the site was stabilized.

Carolina Environmental Contracting’s work was completed two days later and the pipe contractor began culvert installation.  